Next force wipe: December 3, 2026 · in 20 days
Home/Items/Tools/Survey Charge

Survey Charge

Use this on the terrain to see which resources are available for mining.

The Survey Charge is a thrown explosive in Rust. It deals 20 damage (12 blunt and 8 explosion) within 5 m when its fuse of 5 seconds runs out. You craft it at a Level 2 Workbench, and its blueprint costs 300 scrap to research.

About the Survey Charge

From full health, breaking a door takes 13 for the Wooden Door, 36 for the Sheet Metal Door, 86 for the Garage Door and 143 for the Armored Door. For a wall, the count is 34 at Wood, 118 at Stone, 243 at Sheet Metal and 486 at Armored. Broken down to raw materials, one costs 60 sulfur, which puts a stone wall at 7,080 sulfur.

The blast only hurts what it has a clear line to, so solid cover between you and it keeps you out of harm. It leaves your hand at up to 4 m/s.

Survey Charge damage, fuse and blast radius

Anything within 1 m of the blast takes the full damage, which fades to nothing at 5 m.

20DAMAGE
5sFUSE
5mBLAST RADIUS

How to craft the Survey Charge

Crafting one takes 15 seconds at a Level 2 Workbench and costs 30 × Gun Powder, 5 × Cloth, 10 × Metal Fragments and 20 × Low Grade Fuel.

Gun Powder 30
Cloth 5
Metal Fragments 10
Low Grade Fuel 20
Survey Charge
Output ×1
Workbench Level 2
Craft time
WB2 15s
WB3 −50% 7.5s

How to get the Survey Charge blueprint

Research it for 300 scrap, or unlock it on the Level 2 tech tree for 1 Blueprint Page in total.

Research table Burn one copy of the item for its blueprint
Item 1 Item
+
Scrap 300 Scrap
→
Blueprint Blueprint
Research cost 300
Tech tree In the level 2 workbench tree
Node Node
+
Blueprint Page 1 Blueprint Page
→
Unlocked Unlocked
Total to reach 1

Stats checked against the Rust game files on 12 November 2026.